This Campus Notice is more than 1 year old. Links and contact information may have changed.

ITSS services outage planned for July 12鈥�13, 2025

Posting Date(s)

As part of the campus-wide initiative to improve reliability of services and future campus projects, significant work is planned to upgrade critical ITSS Data Centre infrastructure. Related construction is well underway, requiring existing equipment to be relocated to make way for new.

This work鈥攚hich is scheduled from Saturday, July 12, at 4:00 pm to Sunday, July 13, at 4:00 pm鈥攔equires a full shutdown of the existing equipment resulting in a 24-hour loss of ITSS services while the work is promptly completed.  

Services impacted include those at both the 吃瓜头条 Charlottetown campus and St. Peter鈥檚 Bay campus (Canadian Centre for Climate Change and Adaptation).  Specifically, those service impacts include:

  • No Internet access on campus (no access to Outlook (email), SharePoint, OneDrive, Google Drive, Teams, Moodle, RxWorks, LIMS, Colleague, My吃瓜头条, etc. using 吃瓜头条 networks)NOTE: Cloud-based services will still be accessible from outside the 吃瓜头条 network (Moodle, 吃瓜头条.ca, Outlook (email), SharePoint, OneDrive, Google Drive, Teams, etc).
  • No WiFi
  • No authentication system access to log into 吃瓜头条 classroom and lab computers
  • No printer access
  • No file server access (i.e., L and H drives)
  • No 吃瓜头条/AVC data centre-hosted services (My吃瓜头条, Recruiter, RxWorks (AVC Veterinary Teaching Hospital), Robertson Library resources, LIMS, Colleague,  My吃瓜头条, etc.)
  • No network-based monitoring/reporting/management (i.e., Siemens panels, UPS status, AVC鈥檚 aquatic animals facility, etc.)

We apologize for the inconvenience this may cause and appreciate your understanding.